Senior secured construction loan of up to US$[•] to [Project SPV] to fund the costs of the [•] MW campus to completion.
What the filings showUS$100m to US$7.1bn across 23 checked US dollar facilities (median US$790m).
LenderCommitments capped at an agreed loan-to-cost, with cost overruns funded by sponsor equity first.
BorrowerA contingency within the facility and the ability to reallocate savings between phases.
Nscale: Kvandal South data centre facilitiesDDSP: DDSP Sedenak Johor green loanDigital Edge: Digital Edge and B.Grimm Power BKK campus green loanApplied Digital: APLD ComputeCo 3 bridge construction facilityEdgeCore Digital Infrastructure: EdgeCore AS01 and AS02 Sterling construction loansTeraWulf: Raylan Data Hawesville delayed draw bridge