InfraComputeThe capital behind compute.
Research desk · October 2026

Read the structure. Then read the terms.

Analysis, guides and reports on how data centres, GPUs and the power behind them are financed, built from the filed documents. Choose a layer of the stack to see everything written about it.

Pieces in the library
75
Analysis articles
21
Finance terms defined
111
Five layers · 75 pieces

Every financing is a stack: power, the building, the compute, the contracts and the capital. Point at a layer.

    Latest Q3 2026 credit index US$129.8bn across 44 deals New analysis: Where the cash stops: DSCR and cash trap levels in compute finance Deal of the month: Lambda Compute I US$1.008bn at 6.78% fixed New report: The GPU Financing Handbook 25 pages Glossary 111 terms, with examples from filed deals Rolling four quarters US$591bn of disclosed debt
    Benchmarks · 5 min read

    Where the cash stops: DSCR and cash trap levels in compute finance

    Every borrower asks what DSCR the market will accept. The better question is where the cash trap bites, because that is the covenant that changes behaviour long before a default does.

    Read
    Deal of the month

    Lambda Compute I: GPU debt reaches the insurance market

    US$1.008bn at 6.78% fixed, rated A (low) and Baa1. Structure, terms and rating drivers.

    Read
    Free report · 25-page PDF · 25 pages

    The GPU Financing Handbook

    How the 31 public GPU-backed loans since 2023 are structured, priced and protected: six structure diagrams, a term benchmark and a term sheet checklist.

    Get the report
    Reports · available by request

    The long reads.

    Structure diagrams, benchmarks and checklists, drawn from credit agreements, indentures and rating reports. All reports →

    Analysis · 21 articles

    What the deals show.

    Short, sourced pieces on pricing, sizing, security and the contracts behind them, each with one exhibit.

    Cross-sector lessons · 6 min read

    Does the debt outrun the chip?

    Long-dated GPU loans depend on repayment cash flows while hardware values can move sharply. Lessons from aircraft finance help frame the mismatch, but legal recovery rules remain different.

    Read
    Benchmarks · 5 min read

    Where the cash stops: DSCR and cash trap levels in compute finance

    Every borrower asks what DSCR the market will accept. The better question is where the cash trap bites, because that is the covenant that changes behaviour long before a default does.

    Read
    Markets · 5 min read

    From bitcoin to AI: how former miners are financing the switch

    Bitcoin miners own what AI needs most: powered land. Three of them have now financed the switch to AI, in three different ways.

    Read
    Cross-sector lessons · 5 min read

    Is there a Cape Town Convention for compute? What aircraft repossession teaches GPU lenders

    Aircraft lenders can find, register and repossess their collateral under an international treaty. GPU lenders have nothing comparable. The 2026 deals show how the market is filling the gap with contracts.

    Read
    Cross-sector lessons · 5 min read

    Why data centre ABS warns earlier than GPU loans

    Data centre securitisations start trapping cash at 1.30x to 1.35x. GPU project loans wait until 1.10x. That does not make GPU loans riskier. It reflects two different answers to one question: when must the debt be repaid?

    Read
    Pricing · 4 min read

    Fixed or floating? Why GPU loans now come with fixed-rate tranches

    Until 2025 almost every GPU loan was floating rate. In 2026 fixed-rate options appeared in most of the large deals. The reason is simple: the revenue was always fixed.

    Read
    Markets · 5 min read

    GPU financing outside the US: Iceland, the Nordics, Europe, the Gulf and Asia-Pacific

    The largest GPU loans finance US campuses, but the market outside the US is growing quickly. Iceland and the Nordics lead on count. The Gulf and Australia lead on size.

    Read
    Deal anatomy · 4 min read

    Leasing GPUs like aircraft: the lessor model behind xAI's Colossus 2

    Most GPU loans lend to the company that uses the GPUs. The xAI financing put the GPUs in a separate lessor and leased them back, a model aircraft finance knows well.

    Read
    Structure guides · 15

    How each structure works.

    From GPU loans and data centre ABS to powered land and convertibles: the cash flows, the documents and the risks.

    Structure guide

    Hyperscaler support: separate customer credit from lender recourse

    A guide to leases, guarantees, backstops and the claims they actually support.

    Read
    Structure guide

    Data centre ABS: follow the pool and the waterfall

    A practical reading of securitised data-centre cash flows, triggers and expected repayment.

    Read
    Structure guide

    GPU-backed loans: contracts, equipment and repayment

    How GPU collateral and customer cash flows support lending, and where the two can diverge.

    Read
    Structure guide

    Hyperscaler lease-backed project bonds

    How a strong customer contract supports a project without guaranteeing its bonds.

    Read
    Structure guide

    Colocation versus build-to-suit: data centre models and how each is financed

    Retail colocation, wholesale, hyperscale leases, build-to-suit and powered shell compared: who the customer is, how long the contract runs and which financing tools fit each model, with public deal examples.

    Read
    Structure guide

    GPU ABS: how rated and securitised GPU financing works

    What GPU ABS means, how rated GPU financings such as Lambda Compute I are structured, what rating agencies look at, and how the model compares with aircraft ABS. Public sources only.

    Read
    Structure guide

    What is a neocloud, and how is it financed?

    A plain-English guide to neoclouds: what they are, how they differ from hyperscalers and the financing stack they use, from GPU delayed draw term loans to high-yield bonds, convertibles and vendor finance.

    Read
    Structure guide

    Data centre CMBS: property credit meets operating infrastructure

    How mortgage collateral, tenant income and refinance exposure fit together.

    Read
    Structure guide

    Data centre construction finance

    Funding a build from land and power milestones to a financeable operating asset.

    Read
    Structure guide

    GPU borrowing bases: what actually supports availability

    From contract eligibility to concentration limits, valuation and a funding shortfall.

    Read
    Structure guide

    Residual value guarantees and GPU exit risk

    What a value floor can cover, and the recovery risks that can remain.

    Read
    Structure guide

    Convertible finance for neoclouds

    Read the equity option, cash obligations and maturity together.

    Read
    Structure guide

    Financing powered land: prove the power milestone

    A financing framework for land, connection rights and delivery risk.

    Read
    Structure guide

    ECA and DFI finance for data centres

    Match official finance to an eligible project and its actual obligations.

    Read
    Structure guide

    Gulf and Asian capital in global compute

    Separate investor geography from asset location and financing recourse.

    Read
    Clause explainers · 5

    The clauses that carry the credit.

    Security packages, step-in rights, cash traps and covenants, read from filed documents.

    Lending handbook · 12

    Underwriting the compute stack.

    Twelve visual guides to the decisions behind GPU lending, from funding to recovery.

    Lending handbook · Financing

    Financing a GPU project

    Start with the cash obligations that must survive a difficult launch, then choose the funding structure.

    Read
    Lending handbook · Recovery

    Keeping a cluster operating through distress

    Identify what failed, preserve lawful options and compare the value of continued service with a net sale recovery.

    Read
    Lending handbook · Equipment

    From equipment value to net recovery

    An equipment price, an accounting value and a lender's net recovery answer different questions.

    Read
    Lending handbook · Delivery

    The cash cost of a delayed launch

    Link procurement, facility readiness and customer acceptance to cash rather than treating delay as one contingency line.

    Read
    Lending handbook · Delivery

    Reviewing the facility behind the loan

    Review the operating envelope and the lender's practical access before treating colocation as a settled input.

    Read
    Lending handbook · Equipment

    From equipment quote to collateral schedule

    Reconcile price, configuration and ownership before applying an advance rate to the invoice total.

    Read
    Lending handbook · Financing

    Financing a modular data centre

    A modular facility can shorten delivery. Its financing still depends on who controls the equipment, the site and the route to power.

    Read
    Lending handbook · Financing

    Sizing debt against operating cash

    GPU capacity becomes financeable through a sequence of deposits, deliveries, acceptance and collections. Model that sequence before choosing leverage.

    Read
    Lending handbook · Market structure

    Comparing neocloud business models

    Classify operators by the cash they earn, the assets they control and the entity that borrows. A company count cannot answer those questions.

    Read
    Lending handbook · Recovery

    What the risk controls actually cover

    Insurance, cash reserves and replacement operators act on different failures. The value lies in the response path, including what happens before cash arrives.

    Read
    Lending handbook · Financing

    Who benefits from a vendor backstop?

    Capacity purchases, landlord guarantees and residual insurance sit in different places in the financing structure. Follow the payment obligation before assigning credit.

    Read
    Lending handbook · Market structure

    Rack economics: October 2026

    October’s secondary-market evidence shows why a single depreciation rate can give a misleading view of a financed server fleet.

    Read
    Interactive case studies · 5

    Move through the structure.

    Five interactive cases that keep the disclosed terms and the limits of the evidence together.

    The library · everything in one place

    All 75 pieces.

    Filter by layer of the stack or by format, or search. Newest first.

    Showing all 75

    1. AnalysisDoes the debt outrun the chip?Long-dated GPU loans depend on repayment cash flows while hardware values can move sharply. Lessons from aircraft finance help frame the mismatch, but legal recovery rules remain different.Compute
    2. AnalysisWhere the cash stops: DSCR and cash trap levels in compute financeEvery borrower asks what DSCR the market will accept. The better question is where the cash trap bites, because that is the covenant that changes behaviour long before a default does.Capital
    3. GuideHyperscaler support: separate customer credit from lender recourseA guide to leases, guarantees, backstops and the claims they actually support.Contracts
    4. GuideData centre ABS: follow the pool and the waterfallA practical reading of securitised data-centre cash flows, triggers and expected repayment.Buildings
    5. GuideGPU-backed loans: contracts, equipment and repaymentHow GPU collateral and customer cash flows support lending, and where the two can diverge.Compute
    6. GuideHyperscaler lease-backed project bondsHow a strong customer contract supports a project without guaranteeing its bonds.Buildings
    7. PodcastCompute & CapitalThe podcast for the lawyers building AI infrastructure. Season 1 in production.Contracts
    8. AnalysisFrom bitcoin to AI: how former miners are financing the switchBitcoin miners own what AI needs most: powered land. Three of them have now financed the switch to AI, in three different ways.Power
    9. AnalysisIs there a Cape Town Convention for compute? What aircraft repossession teaches GPU lendersAircraft lenders can find, register and repossess their collateral under an international treaty. GPU lenders have nothing comparable. The 2026 deals show how the market is filling the gap with contracts.Compute
    10. AnalysisWhy data centre ABS warns earlier than GPU loansData centre securitisations start trapping cash at 1.30x to 1.35x. GPU project loans wait until 1.10x. That does not make GPU loans riskier. It reflects two different answers to one question: when must the debt be repaid?Buildings
    11. AnalysisFixed or floating? Why GPU loans now come with fixed-rate tranchesUntil 2025 almost every GPU loan was floating rate. In 2026 fixed-rate options appeared in most of the large deals. The reason is simple: the revenue was always fixed.Capital
    12. AnalysisGPU financing outside the US: Iceland, the Nordics, Europe, the Gulf and Asia-PacificThe largest GPU loans finance US campuses, but the market outside the US is growing quickly. Iceland and the Nordics lead on count. The Gulf and Australia lead on size.Capital
    13. AnalysisLeasing GPUs like aircraft: the lessor model behind xAI's Colossus 2Most GPU loans lend to the company that uses the GPUs. The xAI financing put the GPUs in a separate lessor and leased them back, a model aircraft finance knows well.Compute
    14. AnalysisThe customer sets the price: why GPU loan margins fell from 8.75% to 2.25%In three years the margin on GPU-backed loans has fallen by about three quarters. The hardware did not change much. What changed was who stands behind the contract.Capital
    15. AnalysisThe spares reserve: compute's version of the maintenance reserveAircraft lessors have long made airlines pay to keep the asset in condition. GPU lenders are starting to do the same, with a funded reserve for spare hardware.Contracts
    16. AnalysisHow lenders size a GPU loan: two tests, and the smaller one winsEvery GPU loan in the public market is sized twice: once against the cost of the hardware and once against the cash the contract will produce. Here is how the two tests work, with a worked example.Capital
    17. AnalysisWhy the customer contract has to sit in the borrowerIn a GPU loan the customer contract is the credit. If the contract sits with the parent, the lenders are lending against someone else's asset. The 2026 deals all move it into the borrower.Contracts
    18. AnalysisSplitting the GPUs from the building: inside Nscale's Ward County loanNscale's US$1.85bn Ward County financing puts the GPUs and the data centre in two separate companies, then brings both inside the lenders' security. It is one of the clearest answers yet to the question every GPU lender asks: how do I get to my collateral if things go wrong?Compute
    19. AnalysisWho is NVIDIA in your capital stack?NVIDIA makes the collateral in every GPU loan. In some deals it also sits in the cash flow or the equity. Lenders need to know which.Capital
    20. AnalysisOn-chain GPU financing in plain EnglishAlongside the bank-led loans, a small on-chain market lends against tokenised receipts for GPUs. The headline numbers are large. The commitments are not.Capital
    21. AnalysisFull, limited or none: how much parent support GPU lenders takeRecourse to the sponsor is one of the most negotiated points in a GPU loan. The public deals show every answer, sometimes within one sponsor's own facilities.Contracts
    22. AnalysisPooled or single-contract? Two ways to build a GPU facilityA GPU facility can finance a book of customer contracts or a single one. CoreWeave has done both, and the pricing shows what each design costs.Contracts
    23. AnalysisRated GPU debt: how a non-investment-grade sponsor gets to A (low)Three GPU financings now carry public ratings, two of them investment grade. The sponsors are not investment grade. The ratings come from the structure.Capital
    24. AnalysisHow big should a GPU debt service reserve be?When DBRS rated Lambda's Compute I loan, it took half a notch off for one reason: the debt service reserve was lighter than the project finance norm. That puts a price on liquidity.Capital
    25. AnalysisWho lends to neoclouds? From private credit to bank-led project financeIn 2023 GPU loans came from a handful of private credit funds. By 2026 the largest banks were arranging them and rating agencies were grading them. Volume followed.Contracts
    26. ReportThe GPU Financing HandbookHow the 31 public GPU-backed loans since 2023 are structured, priced and protected: six structure diagrams, a term benchmark and a term sheet checklist.Compute
    27. ReportWhat Aircraft and Infrastructure Finance Teach GPU LendersTen lessons from aircraft, shipping and project finance for GPU lenders, with structure diagrams and trigger charts.Compute
    28. Deal noteLambda Compute I: GPU debt reaches the insurance marketUS$1.008bn at 6.78% fixed, rated A (low) and Baa1. Structure, terms and rating drivers.Capital
    29. ToolDebt maturity calendarWhen AI infrastructure debt falls due: 274 maturities from public filings.Capital
    30. ToolFinancing clause libraryCash traps, DSCR, cures, step-in and GPU security, quoted from filed deals.Contracts
    31. ToolGPU security by countryHow lenders take and perfect security over GPUs in 17 countries.Compute
    32. AnalysisOctober 2026 research briefing: follow the obligationThree questions that connect contract credit, delivery and financing economics.Contracts
    33. ExplainerData centre ABS triggers: cash trap, rapid amortisation and the ARDHow the DSCR trigger ladder works in data centre securitisations, with the actual cash trap and amortisation levels from the STACK, Centersquare, Compass, Vantage and Aligned master indentures.Buildings
    34. ExplainerCash sweeps and cash traps: how lenders hold back cashThe difference between a cash sweep and a cash trap, how each is triggered and released, and where they appear in public GPU loans, data centre ABS and lease-backed project bonds.Capital
    35. ExplainerFinancial covenants in GPU loans: DSCR, contract realisation and loan-to-costThe financial tests in public GPU-backed loans explained: sizing DSCR, maintenance DSCR, the contract realisation ratio and depreciating loan-to-cost tests, with figures from CoreWeave, Nscale and IREN filings.Capital
    36. ExplainerThe GPU security package: what lenders take in a GPU-backed loanWhat lenders take as security in a GPU-backed loan: the SPV, equity pledge, GPUs, customer contracts, controlled accounts, direct agreements and parent support, with examples from public filings.Compute
    37. ExplainerOfftake step-in rights and direct agreements in compute financingHow step-in rights, direct agreements and recognition agreements protect lenders, customers and landlords in GPU and data centre financings, with examples from IREN, Nscale, Cipher and CoreWeave filings.Contracts
    38. GuideColocation versus build-to-suit: data centre models and how each is financedRetail colocation, wholesale, hyperscale leases, build-to-suit and powered shell compared: who the customer is, how long the contract runs and which financing tools fit each model, with public deal examples.Buildings
    39. GuideGPU ABS: how rated and securitised GPU financing worksWhat GPU ABS means, how rated GPU financings such as Lambda Compute I are structured, what rating agencies look at, and how the model compares with aircraft ABS. Public sources only.Capital
    40. GuideWhat is a neocloud, and how is it financed?A plain-English guide to neoclouds: what they are, how they differ from hyperscalers and the financing stack they use, from GPU delayed draw term loans to high-yield bonds, convertibles and vendor finance.Compute
    41. BenchmarkAI infrastructure credit index: Q3 2026US$129.8bn across 44 deals. Volume index 157.Capital
    42. GuideData centre CMBS: property credit meets operating infrastructureHow mortgage collateral, tenant income and refinance exposure fit together.Buildings
    43. GuideData centre construction financeFunding a build from land and power milestones to a financeable operating asset.Buildings
    44. GuideGPU borrowing bases: what actually supports availabilityFrom contract eligibility to concentration limits, valuation and a funding shortfall.Compute
    45. GuideResidual value guarantees and GPU exit riskWhat a value floor can cover, and the recovery risks that can remain.Compute
    46. GuideConvertible finance for neocloudsRead the equity option, cash obligations and maturity together.Capital
    47. GuideFinancing powered land: prove the power milestoneA financing framework for land, connection rights and delivery risk.Power
    48. GuideECA and DFI finance for data centresMatch official finance to an eligible project and its actual obligations.Capital
    49. GuideGulf and Asian capital in global computeSeparate investor geography from asset location and financing recourse.Capital
    50. HandbookFinancing a GPU projectStart with the cash obligations that must survive a difficult launch, then choose the funding structure.Capital
    51. HandbookKeeping a cluster operating through distressIdentify what failed, preserve lawful options and compare the value of continued service with a net sale recovery.Compute
    52. HandbookFrom equipment value to net recoveryAn equipment price, an accounting value and a lender's net recovery answer different questions.Compute
    53. HandbookThe cash cost of a delayed launchLink procurement, facility readiness and customer acceptance to cash rather than treating delay as one contingency line.Buildings
    54. HandbookReviewing the facility behind the loanReview the operating envelope and the lender's practical access before treating colocation as a settled input.Buildings
    55. HandbookFrom equipment quote to collateral scheduleReconcile price, configuration and ownership before applying an advance rate to the invoice total.Compute
    56. HandbookFinancing a modular data centreA modular facility can shorten delivery. Its financing still depends on who controls the equipment, the site and the route to power.Capital
    57. HandbookSizing debt against operating cashGPU capacity becomes financeable through a sequence of deposits, deliveries, acceptance and collections. Model that sequence before choosing leverage.Capital
    58. HandbookComparing neocloud business modelsClassify operators by the cash they earn, the assets they control and the entity that borrows. A company count cannot answer those questions.Capital
    59. HandbookWhat the risk controls actually coverInsurance, cash reserves and replacement operators act on different failures. The value lies in the response path, including what happens before cash arrives.Compute
    60. HandbookWho benefits from a vendor backstop?Capacity purchases, landlord guarantees and residual insurance sit in different places in the financing structure. Follow the payment obligation before assigning credit.Capital
    61. HandbookRack economics: October 2026October’s secondary-market evidence shows why a single depreciation rate can give a misleading view of a financed server fleet.Capital
    62. Case studyWhen the debt outlasts the contractCompare the disclosed debt tenor and average customer-contract length. Then examine what renewal risk means.Contracts
    63. Case studyFollow the promise. Find the limitTrace the customer payments, limited guarantees and collateral that sit between a contract and a lender.Contracts
    64. Case studyHow much is actually additional?Separate the previous commitment, the increase and the resulting facility. Keep the amendment attached to its history.Capital
    65. Case studyOne package. Different rate exposuresRead the fixed coupon, floating spread, hedge overlay and commitment fee on their own terms.Capital
    66. Case studyCredit capacity is a step toward powerFollow a utility-credit facility from its disclosed purpose to the delivery evidence still needed.Power
    67. BenchmarkQ4 2026 credit monitor: interimThe register at a glance, its composition and the questions still open.Capital
    68. ToolInside a data centreA scroll cutaway of the building, the compute and the land and power behind it.Power
    69. ToolGPU borrowing baseHow debt capacity falls as hardware ages and contracts run off.Compute
    70. ToolFinancing cost calculatorAll-in cost of a GPU or data centre facility from disclosed margins.Capital
    71. BenchmarkGPU loan marginsDisclosed margins over SOFR, set against customer credit.Capital
    72. BenchmarkTrigger ladderWhere cash traps, amortisation triggers and defaults sit.Capital
    73. BenchmarkThe tenor gapDebt tenor against customer contract length.Contracts
    74. BenchmarkLTV and reservesLoan to value, loan to cost and reserve sizing across deals.Capital
    75. BenchmarkHyperscaler bondsThe investment-grade bonds funding AI build-out.Capital
    Glossary · term of the week

    Cash trap

    A contractual mechanism that retains cash otherwise available for distribution when a specified test is failed. In filed GPU loans the trap usually sits at 1.10x to 1.15x DSCR; in data centre ABS at 1.30x to 1.35x.

    All 111 terms →
    Research notes

    Notes from the register.

    Dated notes on facility histories, project debt and utility credit support, kept with their sources.

    01 · Facility histories

    An upsize needs two numbers.

    Vantage announced two different transactions in June 2025: construction debt for New Albany and an increase to a corporate facility. The corporate amendment added $2.75bn to a $3bn commitment, producing a $5.75bn facility. The increment and the resulting capacity are two descriptions of one amendment.

    DataBank’s October 2025 construction facility similarly increased from $725m to $1.6bn. The difference is $875m. Neither the resulting commitment nor the arithmetic increment establishes how much was drawn.

    Sources: Vantage, 3 June 2025 ↗; DataBank, 17 October 2025 ↗.

    Inspect the facility history →
    02 · Project notes

    A coupon leaves questions open.

    Yondr’s public investor-relations page confirms that Yondr JK 1, LLC issued $715m of 6.875% senior secured notes on 30 June 2026. The earlier pricing announcement describes funding part of the construction of a 48MW critical-IT project in Loudoun County, together with reserves and fees.

    The nominal coupon is a checked term. It is not a complete borrower financing cost: the public material does not supply the full dated amortisation, issue-price, fee and reserve schedule. Confidential investor material was not accessed. The project link establishes stated purpose; it does not verify completion or energisation.

    Sources: Yondr pricing release, 24 June 2026 ↗; public issuer confirmation, checked 22 October 2026 ↗.

    Read the source observations →
    03 · Power & delivery

    Credit support is one part of securing power.

    Yondr’s June 2026 disclosure describes a global letter-of-credit facility supporting utility security requirements. That purpose is relevant to development bankability, but no commitment amount, reserved megawatts or named grid connection is established by the announcement.

    We classify the facility as contingent credit and retain the amount as unknown. We do not add it to funded borrowing or infer a project-level power allocation.

    Source: Yondr corporate facilities announcement, 2 June 2026 ↗.

    Inspect the contingent facility →
    Research coverage

    Read the scope beside the number.

    The register includes historical facilities, amendments, package components and capital observations. Amounts cannot be added into a complete market total. Disclosed margins and coupons do not establish comparable all-in financing costs.

    Coverage remains incomplete. Source links and record qualifications identify what the public disclosures support and where terms remain unknown.

    Read the methodology →
    InfraCompute Weekly · Fridays

    The week in compute finance.

    Financing announcements and the terms worth reading, in one short email. Work email only.

    Subscribe
    Podcast · coming soon

    Compute & Capital

    Conversations with the general counsel building data centres and GPU clouds.

    Find out more
    Written by

    Randeep Bubbra | Lawyer | Making the next generation of infrastructure financeable

    Professional profile ↗ · Discuss a financing

    Public-source research. General information, not legal advice. Views are personal.

    Randeep Bubbra

    InfraCompute Weekly

    The week in compute finance, read from the filings.

    Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

    Working on a GPU or data centre financing? Book 20 minutes with Randeep to compare your terms with the public deals.

    Fridays, one email. Work email only. Unsubscribe any time. Privacy.