How lenders size a GPU loan: two tests, and the smaller one wins
Every GPU loan in the public market is sized twice: once against the cost of the hardware and once against the cash the contract will produce. Here is how the two tests work, with a worked example.
- 01Advance rates run from 70% to 95% of cost.
- 02Sizing DSCRs run from 1.20x to 1.30x. The loan is the lesser of the two results.
- 03After closing, cash traps at 1.10x and covenants from 1.05x police the loan.
Ask a GPU lender how much they will lend and the answer comes in two parts. The first is an advance rate, a percentage of what the borrower pays for the hardware. The second is a debt service coverage ratio, or DSCR: how many times the contracted cash flow covers each payment of interest and principal. The loan is the smaller of the two results.
Test one: the advance rate
The advance rate caps the loan against cost, so the sponsor always has equity at risk. The public deals show a wide range:
- IREN Hardware 3: 95% of project costs for each tranche.
- Nscale Ward County and North Carolina: 90% of GPU capex.
- GMI Cloud: 80% of server capex, with debt also capped at 55% of the value of its NVIDIA contract.
- Crusoe Iceland (launch terms): 75% loan-to-cost.
- USD.AI on-chain frameworks: up to 70% against tokenised GPU receipts.
The highest advance rates sit next to the strongest customers. A 95% advance works only because the contract, not the hardware, carries the credit.
Test two: the sizing DSCR
The second test starts from the contract. The lender projects cash flow available for debt service (contracted revenue less operating costs such as power, colocation fees and maintenance) and sets the debt service the project can carry at a fixed cover. Nscale's US loans size at 1.30x. IREN sizes at 1.20x. Lambda's Compute I loan amortises at a 1.20x minimum DSCR, according to DBRS.
A worked example
Take a simple, illustrative project: US$1,000m of GPUs, a five-year contract and US$260m a year of cash flow available for debt service. Assume a 7% all-in interest rate and a loan that fully amortises over the five years with annual payments.
- Advance rate test at 90%: US$900m.
- DSCR test at 1.30x: the project can pay US$200m a year (US$260m ÷ 1.30). Five annual payments of US$200m at 7% support a loan of about US$820m.
- Loan size: the lesser, about US$820m. The DSCR test binds, and the sponsor funds the remaining US$180m.
Raise the contract cash flow to US$300m a year and the DSCR test supports about US$946m, so the 90% advance rate binds instead, at US$900m. In practice the contract price, the tenor and the interest rate decide which test bites. These figures are illustrative only.
DSCR levels across GPU-backed loans
Show the data table
| Facility | Sizing DSCR | Cash trap | Minimum covenant | Note |
|---|---|---|---|---|
| CoreWeave DDTL 3.0 | n/d | n/d | 1.4x | Tested from 30 Apr 2027; contract realisation ratio of 0.85x also applies |
| CoreWeave DDTL 5.0 | n/d | n/d | 1.35x | Three-month DSCR, tested monthly |
| CoreWeave DDTL 5.5 | n/d | n/d | 1.35x | Cash trap is contract-based: MSA breach or projected contract value below 2.40x of loans |
| Nscale Ward County | 1.30x | 1.10x | 1.05x | Sizing at lesser of 90% of GPU capex and 1.30x; prepayment after six months of trap |
| Nscale North Carolina | 1.30x | 1.10x | 1.05x | Same architecture as Ward County |
| Crusoe Iceland (launch) | 1.30x | n/d | 1.07x | Syndication terms reported by Octus; sizing at lower of 75% LTC and 1.30x |
| Lambda Compute I | 1.20x | n/d | n/d | Amortises at a 1.20x minimum DSCR (DBRS) |
| IREN Hardware 3 | 1.20x | 1.10x | 1.05x | Sizing at lesser of 95% of costs and 1.20x; resizing test at 1.20x |
| CoreWeave DDTL 4.0 | n/d | n/d | 1.15x | Plus a minimum liquidity requirement |
| Nebius GPU loan | n/d | n/d | 1.15x | DSCR covenant reported by Nebius |
After closing: traps and covenants
Sizing sets the loan on day one. A ladder of lower DSCR tests then polices it. In the Nscale and IREN structures a DSCR below 1.10x traps cash, and if the trap lasts six months the trapped cash prepays the loan. The financial covenant sits at 1.05x.
The gap between those levels is the borrower's headroom. A loan sized at 1.30x can absorb a fall in cash flow of about 15% before it reaches a 1.10x trap, and about 19% before a 1.05x covenant. A loan sized at 1.20x has about 8% before the trap and 12.5% before the covenant.
CoreWeave's facilities use a different design. DDTL 3.0, 5.0 and 5.5 carry maintenance DSCRs of 1.35x to 1.40x, and DDTL 4.0 sits at 1.15x with a minimum liquidity test. DDTL 5.5 adds a contract test: cash is trapped if the projected value of the contracts falls below 2.40x of the loans.
A third test: what the GPUs are worth
Some lenders add a value test on top. IREN's Hardware 3 caps the loan at 65% of the depreciated cost of the hardware, tested monthly, on a six-year straight-line life. It is the closest the GPU market has come to the loan-to-value tests used in aircraft finance.
Questions for the next term sheet
- Which costs sit above the line in cash flow available for debt service, and who bears an increase in power costs?
- Is the DSCR historical, projected or both, and over how many months is it averaged?
- How long does a cash trap run before it turns into a prepayment?
- Is there a cure right, and can the sponsor cure with new equity?
For in-house counsel
Take it to the documents
The filed wording behind this piece, for the lender’s or the borrower’s side. Previews are open; the full text is free with InfraCompute Weekly.
- GPU loan summariesFiled GPU credit agreements side by side: advance rates, covenants and the collateral package.
- Financing clause libraryCash traps, coverage ratios, cures, step-in and GPU security, quoted from credit agreements and indentures.
- Issues list: GPU credit agreementBuild it from the lender’s or the borrower’s side, with where filed deals land.
- The legal desk for in-house counselContract library, issues lists, checklists and English law notes.
Sources
- IREN Hardware 3: SEC filing: sec.gov
- Nscale US loans: runtimewire.com
- GMI Cloud: pulse2.com
- Crusoe Iceland launch terms: octus.com
- USD.AI and QumulusAI: newswire.com
- Lambda Compute I: lambda.ai
- CoreWeave DDTL 5.5: CoreWeave release: investors.coreweave.com