InfraComputeThe capital behind compute.

Free report

What aircraft and infrastructure finance teach GPU lenders

GPU lending has rebuilt in three years what aircraft finance, project finance and securitisation took decades to learn. Ten lessons from the older markets, and how far the 2026 deals have already taken them.

Randeep Bubbra | Lawyer | Making the next generation of infrastructure financeable · Firm profile
24 October 2026 · 12-page PDF · Views are personal

Free report

Get the report

Free. Work email only. The download starts here as soon as the form is accepted. How we handle your details.

An old playbook for a new asset.

A GPU cluster is as mobile as an aircraft, financed like a power plant and housed in a building that is itself being securitised. Each older market has already solved part of the problem GPU lenders face now.

Key findings

What the deals show.

Drawn from credit agreements, rating releases and company filings. The full report sets out the sources for every figure.

  1. 01

    GPU debt runs for most of the hardware's life

    Lenders' models assume six years; 2026 GPU loans run up to about six. Aircraft, data centre and renewables debt covers a fraction of the asset's life.

  2. 02

    There is no Cape Town for compute

    GPUs sit in third-party buildings with no asset registry, so enforcement depends on direct agreements and landlord waivers.

  3. 03

    Valuation is still a formula

    GPU loans test cost less straight-line depreciation, not independent appraisals as in aircraft finance.

  4. 04

    ABS warns earlier

    Data centre ABS trap cash at 1.30x to 1.35x. GPU project loans trap at 1.10x and default at 1.05x.

  5. 05

    The second customer is coming

    Remarketing rights and re-leasing tests have arrived in the 2026 deals, borrowing from aircraft finance.

Figure 1

GPU debt runs for most of the hardware's life

Useful life of the assetTypical debt tenor
0 yrs10 yrs20 yrs30 yrs40 yrsGPU serversData centre buildingsCommercial aircraftWind and solarTelecom towers
Show the data table
AssetUseful life (years)Typical debt tenor (years)Note
GPU servers4 to 62.5 to 6Lenders' models assume six years straight-line (IREN, CoreWeave DDTL 2.0); 2026 loans run from 30 months to about six years
Data centre buildings20 to 405 to 23ABS anticipated repayment dates of about five years to amortising lease-backed bonds to 2049
Commercial aircraft25 to 307 to 12Typical secured loan, EETC and ABS amortisation profiles
Wind and solar25 to 3515 to 20Typical contracted project finance tenors
Telecom towers30 to 405 to 10Typical tower ABS anticipated repayment dates
Indicative ranges; GPU life reflects the six-year straight-line assumption in the IREN Hardware 3 and CoreWeave DDTL 2.0 documents. One of four exhibits in the full report.

Inside the report

Read the terms.
Then see the structure.

12-page PDF, written for lenders, investors, sponsors and their advisers.

  1. 01

    Ten lessons

    Valuation, repossession, maintenance, remarketing, servicers, construction, liquidity, diversification, refinancing and third-party support.

  2. 02

    Two structure diagrams

    A typical aircraft ABS and a contracted infrastructure project finance, set against the GPU structures.

  3. 03

    The tenor problem

    Useful life against debt tenor across GPUs, aircraft, data centres, renewables and towers.

  4. 04

    Triggers compared

    Cash trap and amortisation levels in data centre ABS against GPU project loans, from the filed documents.

  5. 05

    Protections side by side

    How aircraft, project finance, data centre ABS and GPU lenders protect themselves, in one table.

  6. 06

    Questions for the market

    Five open questions on registries, appraisals, servicers, lessors and infrastructure investors.

Questions

The short answers.

How long do GPUs last compared with the loans against them?

Lenders' models in the public GPU loans assume a six-year straight-line life, and 2026 GPU loans run from 30 months to about six years. In aircraft, data centre and renewables finance, debt covers a much smaller share of the asset's life.

Is there a Cape Town Convention for GPUs?

No. Aircraft lenders rely on an international registry and fixed repossession timelines. GPU lenders rely on contracts instead, such as direct agreements with colocation providers and landlord waivers.

Why do data centre ABS trap cash earlier than GPU loans?

Data centre ABS trap cash at 1.30x to 1.35x DSCR because the leases may be renewed. GPU project loans are sized to repay in full within the contract, so they trap at 1.10x and default at 1.05x.

What is in the full report?

Ten lessons from aircraft finance, project finance and securitisation, two structure diagrams, two charts, a side-by-side table of lender protections and questions for the market.