InfraComputeThe capital behind compute.
02 / Financing terms · selected comparisons

DSCR & cash triggers

Separate sizing, maintenance, cash trapping and amortisation. Their definitions matter as much as the number.

1.05–1.83xreported DSCR levels

Debt-service coverage levels reported across 5 selected packages, from minimum tests and cash traps to closing ratios.

5 library-reported cases · not independently rechecked

Closing / projectedMinimum or sizing testCash trapAmortisation triggerPurpose not resolved here

Mark shape shows the kind of test. Lambda Compute I is a separate checked agency passage; the others are library-reported.

01

6 selected cases report DSCR levels from 1.05x to 1.83x. Each column is one package; each mark is a different kind of test, by its shape. At 1.00x, cash flow only just covers debt service.

02

Minimum and sizing tests set the floor the debt is built around: IREN 1.05x, Nscale 1.20x, Lambda 1.20x. A sizing ratio applies at funding; a minimum is tested during the loan.

03

Cash traps hold back distributions once coverage falls below them: IREN 1.10x, Nscale 1.15x, Aligned ABS 1.35x. Cash stays in the structure instead of reaching the borrower.

04

Where one package reports several levels, the gap shows its headroom: IREN runs from 1.20x down to 1.05x, a gap of 0.15x; Nscale runs from 1.20x down to 1.15x, a gap of 0.05x; Aligned ABS runs from 1.83x down to 1.20x, a gap of 0.63x. A tighter ladder leaves less room before the next consequence.

05

These are library-reported descriptions, not independently rechecked, and CoreWeave 5.0 and CyrusOne ABS give no resolved test purpose here. Definitions, test dates and cure rights need the documents.

Reading the package

A trigger is a rule, not just a ratio.

A closing DSCR, sizing DSCR and maintenance test answer different questions. Cash trapping can precede rapid amortisation, but thresholds and cure mechanics must be read in their own documents.

At fundingSize the debtDuring the loanTest performanceIf triggeredRestrict cashIf requiredRepay earlier
Separate selected agency passage

Lambda Compute I · 1.20x minimum sizing DSCR

The selected agency passage describes sizing, rather than a verified cash-trap or event-of-default threshold. It is kept outside the library-reported comparison below. This financing also has an unresolved issuer-pricing conflict; the agency passage does not establish its coupon or an all-in cost.

Lambda · Investment-grade fixed-rate DDTL

Morningstar DBRS Lambda Compute I rating report ↗

Library-reported descriptions · not independently rechecked

Selected excerpts from the supplied financing document library’s Deal Comparison sheet. Linked sources are discovery references; their presence does not verify the reported covenant. Amounts, definitions, test dates, permitted adjustments and cure rights require document review. An unreported term is unknown.

Selected library-reported DSCR and cash-control descriptions
Selected caseReported DSCR descriptionReported cash-control descriptionBasisIndexed source
IREN / Microsoft package 1.05x minimum; cash trap below 1.10x; 1.20x projectedCash trap below 1.10x; prepayment after six months as reportedSupplied library · Deal Comparison, row 9IREN Microsoft GPU financing Form 8-K ↗
CoreWeave DDTL 5.0 1.35xMaterial MSA breach cash trap; distribution reserveSupplied library · Deal Comparison, row 7CoreWeave DDTL5 Form 8-K ↗
Nscale Europe GPU DDTL 1.20x IG sizing DSCRCash trap below 1.15x historical DSCRSupplied library · Deal Comparison, row 23Nscale GPU credit agreement — initial commitment and margin ↗
CyrusOne ABS 2025-1 1.6x; specific test purpose not resolved hereNot reported in the comparison sheetSupplied library · Deal Comparison, row 28CyrusOne Data Centers Issuer I 2025-1 ↗
Aligned ABS 2026-1 Closing 1.83x; cash trap below 1.35x; amortisation below 1.20xDSCR cash trapSupplied library · Deal Comparison, row 33Aligned Data Centers Completes $1.18 Billion Securitisation Financing ↗

Use this to ask better questions.

Identify the numerator and denominator, forward or historical measurement, reporting period, testing frequency, threshold, cure period and exact consequence. Do not rank a 1.20x sizing test against a 1.35x cash trap as though one package were simply tighter.

Open selected deal comparison →
Next topic · 03LTV, LTC & reserves65–70%Compare selected descriptions without treating a cost cap, value test and cash reserve as one ratio.Read →
Randeep Bubbra

InfraCompute Weekly

The week in compute finance, read from the filings.

Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

Benchmarking a term sheet? Book 20 minutes with Randeep.

Fridays, one email. Work email only. Unsubscribe any time. Privacy.