InfraComputeThe capital behind compute.
Financing / structure guide

Hyperscaler lease-backed project bonds

How a strong customer contract supports a project without guaranteeing its bonds.

A lease-backed project bond relies on cash owed under specified leases or service contracts and on the issuer's financing structure. A hyperscaler relationship can strengthen a payment stream without making that hyperscaler liable for every project obligation.

Conceptual financing path Read the actual rights and cash flows in the documents.
  1. 01Tenant obligation
  2. 02Project collections
  3. 03Reserves & costs
  4. 04Bond debt service

Trace the promise to its beneficiary

Begin with the legal tenant, any guarantor and the obligation covered by support. Rent, termination amounts, power charges and debt service are separate promises. Identify who may claim, when payment is due and the relevant cap. Avoid moving a guarantee across entities simply because it appears in the same project announcement.

Examine the delivery interface

Before acceptance, project completion and customer payment obligations may not align. Compare construction milestones, longstop dates, fit-out requirements and service tests with draw conditions. Determine who pays interest, operating costs and overrun amounts while customer billing has not begun. A long lease term does not fund a delayed start by itself.

Match contractual cash to the bond schedule

Model lease collections against bond principal, interest, reserves and essential operating costs by period. Separate indexation and power pass-through from fixed rent. Examine expiry, renewal and termination assumptions. A contracted revenue total is not cash available for debt service and should not be used as a simple coverage multiple.

Read a disclosed example narrowly

The River Bend filing separates lease-related support from the project notes and states that the notes are not guaranteed by the parent, tenant or lease guarantor. The existing interactive credit-support case maps that distinction. The lesson is to follow the obligation and beneficiary, rather than infer noteholder recourse from a recognisable corporate name.

From the filed documents

when a landlord builds an AI data centre campus for a neocloud or hyperscaler, it often refinances construction with a secured bond issued by the campus-owning company. Investors buy the lease, so the coupon tracks the tenant's credit. Public deals in 2025 and 2026 show a clear pricing ladder, from about 9.25% for a non-investment-grade tenant to under 7% for an investment-grade one.

The structure

  1. Issuer. A ring-fenced company owns the campus, its leases and its accounts.
  2. Leases. Typically triple-net, 10 to 15 years, with one tenant or a small group.
  3. Security. Land, buildings, equipment, the leases, accounts and the shares in the issuer.
  4. Construction support. The sponsor gives a completion guarantee until the buildings are delivered and rent starts.
  5. Reserves. A debt service reserve funded at closing, sometimes sized to cover interest during construction.
  6. Cash management. A waterfall, with sweeps or scheduled amortisation.
  7. Offering. Usually Rule 144A, high yield or investment grade depending on the tenant.

The pricing ladder: 2025-26 public deals

Issuer (campus) Date Size Coupon Tenant / credit support
Applied Digital (Polaris Forge 1) Nov 2025 US$2.35bn 9.25% at 97.0 CoreWeave
Core Scientific (CoreWeave campuses) May 2026 US$3.3bn 7.75% at 99.25 CoreWeave
TeraWulf (Lake Mariner) Oct 2025 US$3.2bn 7.75% Fluidstack, Google backstop
TeraWulf / Fluidstack JV (Flash Compute) Dec 2025 US$1.3bn 7.25% Fluidstack, Google backstop
Cipher (Barber Lake) Nov 2025 US$1.4bn 7.125% Fluidstack, Google backstop
Applied Digital (Polaris Forge 3, ELN-04) Jun 2026 US$1.59bn 7.00% Hyperscaler-grade tenant
Applied Digital (Polaris Forge 2) Mar 2026 US$2.15bn 6.75% Oracle (BBB)
Hut 8 (River Bend) Apr 2026 US$3.25bn Investment grade (coupon n/d) Fluidstack, Google backstop; c. 16.5-year amortising
Meta Hyperion (Beignet Investor) Oct 2025 US$27.3bn c. T + 225bp, S&P A+ (prelim.) Meta leases plus residual value guarantee

Source: issuer indentures and filings listed below; Meta pricing from public reporting. Sizes are at issue.

Three patterns are visible:

  • Tenant credit drives price. The same sponsor, Applied Digital, priced at 9.25% with CoreWeave as tenant and 6.75% with Oracle.
  • Backstops narrow the gap. Google-backstopped Fluidstack leases priced between the CoreWeave and Oracle deals.
  • Longer, amortising debt needs investment-grade support. Hut 8 and Meta Hyperion, with the strongest credit support, raised long-dated amortising debt; the high-yield deals are around five years.

Key terms in the indentures

Cash sweeps and amortisation. The Google-backstopped bonds (TeraWulf, Cipher, Flash Compute) sweep 50% of excess cash flow. Core Scientific's notes repay in instalments of 11.5% a year of original principal.

Lease termination redemption. If a tenant pays a termination fee, bondholders expect it to repay the notes. Applied Digital's Polaris Forge 2 indenture includes a "Datacenter Lease Termination Fee Mandatory Redemption".

Add-on debt. Indentures allow more notes for new buildings, subject to limits. Flash Compute caps add-on debt at 70% loan-to-cost; Core Scientific at 85%.

Reserves. Debt service reserves are large at closing because there is no rent yet. TeraWulf's indenture sets the required amount at US$447m on the issue date, then, during construction, US$265m plus the next two scheduled interest payments, less interest already paid. Cipher's deal follows a similar pattern (US$210m at issue, US$110m base amount).

Completion support. Every high-yield deal in the table relies on sponsor completion guarantees until rent starts, because investors are funding buildings that are not yet built.

How this compares with other options

Lease-backed project bond Construction loan Data centre ABS
Stage Construction to early operation Construction Stabilised
Investors Bond market (HY or IG) Banks ABS investors
Rate Fixed Floating Mostly fixed
Typical term About 5 years (HY); longer if IG 2 to 3 years ARD about 5 years
Tenant base One or a few tenants One or a few Diversified pool
Working checklist

Questions to take to the documents

  1. Does support cover rent, completion, residual value or debt service?
  2. Which delivery failures permit termination or suspend payment?
  3. What happens to the debt if the lease ends before final maturity?

Explore the disclosed examples

Open a register record for its dated amount, classification and source limitations. A link is not certification of all terms.

Common questions

Questions clients ask

What is a lease-backed project bond?
A secured bond issued by a ring-fenced company that owns a data centre campus, repaid from rent under leases to one or a few tenants. Investors look mainly to the lease and the tenant's credit.
Why do these bonds price so differently?
Because pricing follows the tenant. In 2025-26 public deals, campuses leased to non-investment-grade neoclouds priced around 7.75% to 9.25%, while those with an investment-grade tenant or a Google backstop priced around 6.75% to 7.25%.
What protects bondholders during construction?
Completion guarantees from the sponsor, debt service reserves funded at closing and, in some deals, limits on additional debt measured by loan-to-cost.

For in-house counsel

Take it to the documents

The filed wording behind this piece, for the lender’s or the borrower’s side. Previews are open; the full text is free with InfraCompute Weekly.

Evidence & interpretation

Sources for the examples

Selected public sources support the examples. The analytical framework is InfraCompute editorial work; source links do not imply a complete agreement or legal review.

  1. Hut 8 Q2 2026 Form 10-Q — River Bend notes ↗Disclosure date: 2026-08-04
  2. Applied Digital Polaris Forge 1 9.25% notes indenture (Ex 4.1) ↗
  3. Applied Digital Polaris Forge 2 6.75% notes indenture (Ex 4.1) ↗
  4. TeraWulf Lake Mariner 7.75% notes indenture (Ex 4.1) ↗
  5. Cipher Barber Lake 7.125% notes indenture (Ex 4.1) ↗
  6. Core Scientific 7.75% notes indenture (Ex 4.1) ↗
  7. Hut 8 Q1 2026 results (Ex 99.1) ↗
Randeep Bubbra

InfraCompute Weekly

The week in compute finance, read from the filings.

Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

Working on a GPU or data centre financing? Book 20 minutes with Randeep to compare your terms with the public deals.

Fridays, one email. Work email only. Unsubscribe any time. Privacy.