Helios two-building phaseII
Helios two-building phaseII: location, development status, financing connections and disclosed power context.
Project overview
Helios two-building phaseII is recorded in US / Texas, with Galaxy Digital named in the sponsor or operator context. The recorded stage is: Source-reported project; current construction/energisation unverified.
- Geography
- US / Texas
- Sponsor / operator context
- Galaxy Digital
- Recorded project stage
- Source-reported project; current construction/energisation unverified
- Dated source
- 23 July 2026
Financing connections
Operator and issuer research
Power context
Helios phaseII reported utility capacity
- Relationship
- reported utility capacity
- Technology
- Grid utility capacity; generation mix unknown
- Capacity
- 400 MW
- Capacity basis
- Utility power capacity; distinct from260MW critical IT
Do not add utility and ITMW. No interconnection or actual energised capacity audit.
Other recorded projects in this geography
For counsel on this project
Picked for its latest recorded financing, senior secured project notes: the filed precedents for documents like it, for the developer’s or the lenders’ side. Previews are open; the full text is free with InfraCompute Weekly.
Sources
- Galaxy Digital Inc. Announces Pricing of $3.507 Billion of Senior Secured NotesSource date: 23 July 2026
About this record
Compiled from public announcements. Capacity, stage and power are as the developer states them and may not be verified. Methodology · Send a correction.