Tools  /  Contract library  /  Power: pass-through and the utility contract

Contract library · Data centre leases

Power: pass-through and the utility contract

Who pays for the electricity, and who holds the utility contract?

Power is the largest running cost in an AI data centre. The filed leases pass the cost of electricity through to the tenant. The Applied Digital lease went further and let the tenant take over the utility contract, a right deleted when the lease was moved into a financed SPV. Ionic Digital’s lease to Nscale goes further: the landlord supplies only the substation capacity, 234 MW now and 89 MW later, and is not liable for any utility failure.

Randeep Bubbra | Lawyer | Making the next generation of infrastructure financeable · Firm profile ·

What the filed contracts say

ContractWhat the filed wording says
Applied Digital / CoreWeave leaseThe tenant pays the cost of electricity actually consumed by the building, including common areas, as additional rent.
Applied Digital / CoreWeave leaseThe tenant may take an assignment of the landlord's utility agreement or contract with the utility directly.
Applied Digital lease assignmentWhen the Building 3 lease moved to CoreWeave's financing SPV, the right to take over the utility agreement was deleted.
BXDC form leaseThe landlord provides the contracted power capacity and bills it separately each month, with the critical infrastructure.
Ionic Digital lease to NscaleThe landlord provides step-down transformation for 234 MW, plus 89 MW more when the utility makes it available, and is not liable if utility power fails.

The filed wording

Each month, starting after the applicable Commencement Date, Tenant will be charged Tenant’s Power Payment (as defined on Schedule “I”), as Additional Rent, which shall equal the cost of electricity actually consumed by the Building, including all Data Halls and ancillary spaces and Common Areas, subject to the terms of Schedule “I” attached hereto.
Applied Digital–CoreWeave datacenter lease, Building 2 (Ellendale), section 3.4.1 · Applied Digital 8-K, Exhibit 10.1

On the deal pages

Financings by the parties to these contracts

The latest debt raised by the companies that signed them, with the terms and the sources on each deal page.

FinancingBorrower or issuerDateAmount
CoreWeave 2.875% convertible senior notes due 2033CoreWeave18 September 2026US$4.2bn
Pre-IPO convertible loan-note subscription (initial minimum)Nscale15 September 2026US$2.1bn
Dell short-term equipment lease payment schedules (aggregate)Nscale4 September 2026US$2.54bn
North Carolina GPU DDTLNscale31 August 2026US$1.2bn
Ward County GPU DDTLNscale31 August 2026US$1.85bn

Follow alerts

Follow Power: pass-through and the utility contract

New filed wording for this clause from customer contracts, leases, colocation, power contracts and backstops. One email when something changes, nothing otherwise. Confirm by email; stop with one click.

Method

Each extract is quoted from the contract as filed with the SEC, checked against the filed text when it was added; “…” marks words left out. Filers redact commercial terms, so a [***] or [*] is the filer's, not ours. The summaries describe the wording, not how a court would read it, and each contract's defined terms and other clauses can change the effect. General information drawn from public filings. It is not legal advice on any transaction, and using this page does not create a lawyer-client relationship. Views are personal.

Randeep Bubbra

InfraCompute Weekly

The week in compute finance, read from the filings.

Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

Want to run your own deal through these tools? Book 20 minutes with Randeep.

Fridays, one email. Work email only. Unsubscribe any time. Privacy.