Follow the financing.
Financing history from 2015: data-centre bonds, securitisations, project loans, GPU facilities and corporate capital. Open any record for its source, amount basis and qualifications.
419 debt records retained after rule-based grouping of facility histories, converted to US dollars using deal-date exchange rates. Debt financing recorded, not a market total or debt outstanding. How this total is built →
- Financing records
- 541
- Operators & issuers
- 135
- Coverage
- 2015–2026
Equity and M&A
Who is buying and backing the sector.
37 equity raises, M&A deals, stake sales and joint ventures in data centres and GPU clouds, tracked separately from the debt totals above.
47 records
+7 on Q3 2025 · US$132.8bn debt counted
- Corporate debt13
- Securitisation6
- Development / project10
- GPU / equipment10
- Convertible / hybrid6
- Non-debt observations2
- Goldman Sachs5
- Morgan Stanley4
- J.P. Morgan3
Records naming the bank in an arranging or lending role. Arranging or lending banks are named in 19 of the 206 records in the period. Trustee, collateral agent, security agent and equity roles are excluded.
What the evidence labels mean
Selected checks apply to named fields, not the whole transaction. Inherited records remain unverified; conflicts stay visible. Amounts include historical facilities, amendments and non-debt observations. Raw amounts must not be added together; the debt total above applies the de-duplication rules in the methodology. Pricing is nominal, not an all-in cost.
Market breakdown → · Amount ordering requires a single currency. It does not make different commitment and proceeds bases comparable.
| Compare | Operator / capital type | Instrument / event | Amount / basis | Disclosed pricing |
|---|
Research cut: 22 October 2026. Small pages and request limits apply. Bulk exports and original files remain restricted. Visible information can still be copied.
How facilities grow.
Recurring facilities and issuance programmes, oldest to newest. Each stop is a separate record: scroll sideways along the line and open any stop for its terms. Stops describe one programme's history and are not additive capital.
- ABS II (Phoenix) 2026-1Undisclosed
- ABS II (Phoenix) 2026-2Undisclosed
- ABS II (Phoenix) 2026-3Undisclosed
- ABS II (Phoenix) 2026-4Undisclosed
- ABS II (Phoenix) 2026-5Undisclosed
- ABS II (Phoenix) 2026-6Undisclosed
- BX 2026-VLT10 (New Albany OH) CMBSUS$1.3bn
- ABS II (Phoenix) 2026-7Undisclosed
- ABS II (Phoenix) 2026-8Undisclosed
- Thunder master indenture (Blackstone)US$3.6bn
- US$750m 5.50% senior notes due 2034US$750m
- EUR600m 3.65% notes due 2033 and CHF100m 1.5575% notes due 2029€600m
- EUR1.15bn senior notes (2031 and 2034)€1.1bn
- SGD senior notes due 2030S$500m
- Two-series euro senior notes package€1.5bn
- US$1.25bn 4.60% senior notes due 2030US$1.2bn
- C$700m 4.00% senior notes due 2032C$700m
- Two-series USD senior notes packageUS$1.5bn
- C$1.25bn senior notes (2030 and 2035)C$1.2bn
- US$3bn senior notes (2029, 2031, 2033, 2036)US$3.0bn
Follow a thread.
Facility histories and project links for each borrower and issuer.
Most records- Digital Realty29
- CoreWeave25
- Equinix25
Named agents, arrangers and investors. A named role is not retained exposure.
Most named in arranging or lending roles, 12 months- Goldman Sachs5
- Morgan Stanley4
- J.P. Morgan3
Documented links from financings to physical sites and their power.
Most linked financings- Africa Data Centres regional expansion programme2
- Childress Microsoft GPU deployment2
- Cloverleaf US powered-site development programme2
Line up amount basis, pricing, dates and credit support for up to three financings.
Open →Inside the financing
Explore the individual research pages.
Page 22 of 55. These pages include the disclosed terms, sources and record qualifications in readable HTML.
- Vantage Data Centers / Vantage Data Centers Jersey UK ABS 2025 tap
2025-10-30
- SF ABS Parent / SF ABS Issuer 2025-1
2025-10-28
- Crusoe / Series E initial closing and anticipated round
2025-10-24
- Compass Datacenters / Compass Datacenters Issuer II 2025-2
2025-10-23
- TeraWulf / Senior notes
2025-10-23
- STACK Infrastructure / TKY01 green development facility
2025-10-23
- Bitfarms / Bitfarms 1.375% convertible senior notes due 2031
2025-10-22
- Meta Platforms / Hyperion development joint-venture capital commitment
2025-10-21
- DataBank / DataBank green construction facility upsize to US$1.6bn
2025-10-17
- Flexential / Flexential Issuer 2025-1
2025-10-17
