Tools / Regulatory tracker / FERC rules for connecting large loads
Regulatory tracker · United States · Grid and power
FERC rules for connecting large loads
DOE asked FERC to set federal rules for connecting loads over 20 MW to the transmission system, including data centres co-located with generation.
Proposed DOE proposal of 23 October 2025 under section 403; FERC docket RM26-4-000, comments closed 21 November 2025 and reply comments 5 December 2025. Listed at the proposed rule stage in the Unified Agenda of August 2026.
What it does
The rule in brief
Using its power under section 403 of the Department of Energy Organization Act, DOE proposed that FERC assert jurisdiction over the interconnection of large loads (over 20 MW) to the interstate transmission system, including hybrid facilities that co-locate load with generation. The proposal covers standard study deposits, readiness requirements, withdrawal penalties and faster studies for loads that agree to be curtailed. DOE asked FERC to take final action by 30 April 2026.
Timeline
Key dates
| Date | What happens |
|---|---|
| 23 October 2025 | DOE sends its proposal to FERC |
| 27 October 2025 | FERC invites comments |
| 21 November 2025 | Comments due |
| 5 December 2025 | Reply comments due |
| 30 April 2026 | Date DOE asked FERC to take final action |
Primary sources
Read it at source
- DOE: letter to FERC under section 403 on large load interconnection (23 Oct 2025) Government
- Unified Agenda, Federal Energy Regulatory Commission: Interconnection of Large Loads to the Interstate Transmission System (14 Aug 2026) Federal Register
Cite as: InfraCompute regulatory tracker, “FERC rules for connecting large loads”, checked 27 October 2026, https://www.infracompute.co.uk/tools/regulatory-tracker/us-ferc-large-load-interconnection.
Related
Also on the tracker
US export controls on advanced AI chips
Licences for advanced GPUs to most of the world outside close allies; China moved to case-by-case for H200-class chips.
United States · Export controlsAI Diffusion rule (rescinded)
The January 2025 country-tier rule was rescinded in May 2025; BIS said a replacement rule would follow.
United States · Export controlsData Center Validated End User authorisation
Pre-approved data centres abroad can receive controlled chips without a licence for each shipment.
United States · Export controlsUAE moved to Country Group A:5
Licence-free access to advanced computing items for the UAE Government and approved UAE entities.
Method
Each entry is written from the official text and the government, regulator or legislature pages listed above, never from secondary commentary. New documents on the Federal Register are picked up automatically and listed here. Status and dates can change after the review date, so check the source before relying on it. General information drawn from public filings. It is not legal advice on any transaction, and using this page does not create a lawyer-client relationship. Views are personal.