Anthropic filed its final prospectus (424B4) on 19 November 2026. The prospectus reports $900.9bn of compute and lease commitments, $161.2bn of rent under Broadcom equipment leases, a $15.0bn revolving facility and $77.0bn of undrawn note capacity. This page sets out how those pieces are contracted and where each figure sits in the filing.
This page summarises a public filing. It is not investment advice.
As filed. From Anthropic's final prospectus (424B4), 19 November 2026.
Last updated 18 November 2026Read from the filing on SEC EDGAR
Not legal advice. This page is general information only. Laws and regulations change and every matter differs, so take independent legal advice before acting. Read the full notice below.
Key figures from the filing
$900.9bn
committed spend, as of and after 30 September 2026.
p.178
$186.2bn
in arrangements with termination rights or conditions.
p.178
$161.2bn
rent on the Broadcom leases, excluding interest.
p.181
$15.0bn
revolving facility, undrawn at 30 September 2026.
p.171
How the compute is contracted.
Compute contracts
How the compute is contracted.
The filing sets out four kinds of compute arrangement. Each is shown with its amount, its basis and the page.
Cloud capacity
Microsoft: at least $47.2bn and up to $49.2bn, November 2026 to June 2033. Google hosting: at least $121.3bn, April 2026 to July 2033. Amazon: at least $110.0bn, May 2026 to April 2036. Each is payable regardless of usage. More Google TPU compute has no fixed amount; the filing estimates $125.0bn to $150.0bn, outside the table. pp.179, 180
GPU capacity from neoclouds
SpaceXAI: up to $120.5bn over terms into 2029. Nscale: up to approximately $44.6bn into 2033. Lambda: approximately $41.3bn into 2034. All provide NVIDIA GPUs. Nscale and Lambda fees accrue only as capacity is delivered and accepted. Lambda's August 2026 agreement, approximately $34.9bn, is currently terminable by either party. p.180
AMD hardware supply
A July 2026 supply agreement for Helios rack-scale systems with Instinct MI450 GPUs: initial tranche in 2027, no fixed amount. The filing expects spend above $20.0bn if the full initial capacity is procured. AMD also committed to buy up to $5.0bn of Class N stock, cut to $2.5bn by its private placement purchase. pp.172, 180
Anthropic Direct
The filing's name for leasing chips directly and hosting them in dedicated facilities operated on its behalf. It separates data centre commitments from accelerator commitments. p.144
Read the detail
How the Broadcom equipment leases work.
Broadcom leases
How the Broadcom equipment leases work.
The filing describes equipment leased to two special purpose subsidiaries, with a parent guarantee and the equipment as security.
- The lessor is Broadcom and, after assignments, financing entities.
- Two special purpose subsidiaries are the lessees, and Anthropic, PBC guarantees their obligations.
- The leased equipment is the security.
- Rent starts typically when equipment is "ready for service".
- The 2026 Lease Arrangement rent is approximately $125.2bn of the $161.2bn total (pp.79, 181).
- Anthropic may issue notes under the Infrastructure Partner 2026 NPA only to finance quarterly rent.
The SPV financing is covered on the Deal of the month page and the deal page; we do not repeat it here.
When the obligations fall due.
Maturities
When the obligations fall due.
The filing's contractual obligations table runs year by year from 2026 to thereafter.
Payments due by year, US$ millions (the filing's contractual obligations table)
- 2026$5,231m
- 2027$29,165m
- 2028$44,357m
- 2029$47,752m
- 2030$45,070m
- Thereafter$148,418m
The debt and note capacity: key terms.
Debt terms
The debt and note capacity: key terms.
One revolving facility and several note agreements, with the rate, maturity, amount, key condition and page for each.
$77.0bn
of undrawn convertible note capacity. p.179
$70.7bn
due in the 12 months after 30 September 2026. p.179
- A&R Credit Agreement: revolving facilitySenior secured and guaranteed. Term SOFR or ABR plus a margin. Matures 4 September 2031, subject to a springing maturity. Security is released at an investment grade rating from two of Moody's, S&P and Fitch.
$15.0bn
all of it available for letters of credit. Undrawn at 30 September 2026; $205m of letters of credit. Minimum liquidity $5.0bn from 31 December 2026. p.171
- Amazon notes: 2023 and 2024 NPAsNon-interest-bearing rollover notes. 2023 NPA notes mature March 2034; 2024 NPA notes mature January, May and November 2035. Conversion is capped at 12% ownership, not waived.
$6.2bn
outstanding: $2,186m (2023) and $4,017m (2024). No more can be issued. pp.172, 173
- Google 2026 NPAA convertible note on terms to be agreed, or Class N shares at the 30-day trailing volume-weighted average price. Draws to 31 December 2030. Ownership cap 14.99%.
$20.0bn
cut to $10.0bn when the concurrent private placement closes. Undrawn. p.176
- Amazon 2026 NPADraws are settled in Class N shares at the 30-day trailing volume-weighted average price once a compute milestone is met. Notes mature 10 years from issue. Available to the earlier of 30 months after the offering and the end of certain commercial agreements.
$15.0bn
in $5.0bn increments. Undrawn. p.174
- Infrastructure Partner 2026 NPA (Broadcom)Notes only to finance quarterly rent under the 2026 Lease Arrangement. 9.00% paid in kind; the holder converts at 90% of the 30-day trailing average price (13.00% interest and 85% if revenue conditions are not met). Maturity 60 months for the first $24.0bn, 63 months up to $32.0bn, 57 months above. Subsidiary guarantees; junior security over the lease collateral.
$42.0bn
undrawn. The draw period starts when the equipment is serviceable and runs five years. Conditions include $5.0bn minimum liquidity. Change of control: 150% in cash, or convert. p.175
What the filing lists as risks for counterparties.
Filing risks
What the filing lists as risks for counterparties.
Each point is the filing's own risk factor wording, quoted, with the page. It is not our view.
Payment before usable compute
The filing lists as a risk that "we may be obligated to pay a counterparty once it performs its discrete obligation", even if others delay the compute. p.80
Multi-party chains
The filing lists as a risk arrangements where "chips are procured from or through our CSPs, leased to us by third-party financing entities, installed in data center facilities procured by or through other third-party partners". p.80
Completion and credit support
The filing lists as a risk "completion guarantees that may terminate upon a lender foreclosure before construction is complete", and reliance on "credit support provided by a third party that is also a competitor". p.81
Long terms and chip supply
The filing lists as a risk "initial terms of 20 years" with "take-or-pay compute payment obligations and uncapped fuel cost pass-throughs" (p.81), and financing arrangements that require "exclusive or preferential supply commitments with particular chip suppliers" (p.41).
Questions about the filing.
Questions
Questions about the filing.
Short answers, each with the figure and the filing page.
How much has Anthropic committed to spend on compute?
Approximately $900.9bn, substantially all for compute and infrastructure, as of and after 30 September 2026; about $451.6bn before 31 December 2030. Arrangements with no fixed amount, estimated at $150bn to $175bn, are excluded. pp.40, 178
How much of that is conditional?
Approximately $186.2bn is in arrangements with termination rights or conditions before commencement, such as a counterparty securing financing or facilities. p.178
How much falls due in the next 12 months?
Approximately $70.7bn in the 12 months after 30 September 2026, of which about $4.2bn is conditional. p.179
What are the Broadcom equipment leases?
Five-year master finance leases with rent of approximately $161.2bn excluding interest, paid quarterly. Only the lessor can cancel, on a default. p.181
How are data centre (data center) leases treated?
The filing separates data center capacity commitments from accelerator commitments under Anthropic Direct (p.144). Leases not yet commenced were approximately $451.2bn undiscounted (p.179).
Is this the final prospectus?
Yes. This page cites the final prospectus (424B4), 19 November 2026. It was first written from Amendment No. 3 to the Form S-1 (17 November 2026), and each figure and page was then checked against the final prospectus.
Primary sources.
Primary sources
Primary sources.
Every figure on the page is read from these filed documents.
Method
Method. Every figure is read from the final prospectus (424B4) on SEC EDGAR and carries its page.
Important notice
This page is general information about how these financings are commonly structured, drawn from public sources. It is not legal, financial, tax or investment advice, it is not a substitute for advice on your own circumstances, and it does not create a lawyer-client relationship with anyone. Statements of law are general summaries only. Unless a statement says otherwise, they refer to the law of England and Wales and to companies registered at Companies House in the UK; the law of other jurisdictions differs. Laws, regulations and market practice change, and this page may not reflect changes after the date shown. The facts and circumstances of every transaction differ, and the outcome in any matter depends on its documents and facts. Do not act, or refrain from acting, on the basis of this page. You should seek independent legal advice on the content of this page and on your own situation before relying on it. To the fullest extent permitted by law, we accept no responsibility or liability for any loss arising from reliance on this page.