InfraComputeThe capital behind compute.
AI infrastructure finance research

The capital
behind compute.

Independent research on GPU financing and data centre finance: how GPUs, data centres and the power behind them are financed, read from the public record.

554
Deals
140
Operator & issuer profiles
169
Lenders
68
Projects

In-house counsel? Open the legal desk

Scroll

The research, in numbers

Deals
554
Operator & issuer profiles
140
Lenders
169
Projects
68

Coverage 2015 to 19 November 2026. Counts are research coverage, not unique originations or a complete market total. About the data →

1 Land & power

Power comes before the building.

Powered land is valued on its grid connection: the interconnection agreement, the substation and the date it energises. Utility supply, contracted power and energised IT load are different quantities, and each needs its own evidence.

Projects & programmes tracked
68

Latest on the registerAtlas Energy SolutionsData centre power equipment bridge facility · US$424m

2 On-site generation & storage

Bridging the wait for the grid.

Behind-the-meter gas engines and battery storage can bring capacity forward or carry the halls when the grid cannot. They are energy assets with their own lenders, so the fuel supply agreement, the power purchase or tolling contract and who carries performance risk become credit questions.

3 The shell

From construction loan to securitised asset.

Construction debt is sized against a budget and a completion date. Once the halls are leased and stabilised, the same building can refinance through CMBS, ABS or lease-backed project bonds, usually on different terms.

Development & project debt records
82
Data-centre securitisation records
133

Register records, including histories and amendments; not unique originations. The component cutaway and internal frame are illustrative.

Latest on the registerHaoyang Data Center 1 (Thailand)Phase 1 bank facilities · US$590m

4 Cooling & electrical

Where completion risk sits.

Chillers, switchgear and UPS are long-lead equipment and a large share of fit-out cost. Delivery slots, contractor security and commissioning tests decide when a facility can draw its debt and when rent starts.

5 Compute

The GPUs are the collateral.

GPU fleets are financed with delayed-draw term loans secured on the equipment and the customer contracts it serves. Lenders size them against contracted cash flow and a view of residual value, because the hardware can lose value much faster than a building.

Selected disclosed margins over SOFR
+225–550bp
GPU-secured records
44

6 selected facilities. Across all disclosed GPU loans the range is 225–750bp. Margins exclude the benchmark, fees and issue discount; they are not an all-in cost.

Latest on the registerHIVE Digital TechnologiesHIVE BUZZ Alpha Cloud GPU-secured term loan for sovereign AI cluster · US$129m

6 Network & offtake

The tenant pays for it all.

Fibre and interconnection tie the campus to its customers, and the customer contract is what lenders underwrite. Take-or-pay terms, the tenant’s credit and step-in rights decide how the debt is repaid if something goes wrong.

Pages by reader

Read the register from your side of the deal.

The same register, read five ways.

Equity and investments

Financing research

Updated
19 November 2026
Coverage
2015–2026
Records
554, each with its source

Data centre and GPU financing research, from the public record

Follow the financing.

Every layer of the campus you have just explored has its own lenders, terms and evidence. The register keeps each financing with its source, from data-centre bonds and securitisations to project loans and GPU facilities.

Disclosed debt financing recorded
US$973.2bn
431 debt records at deal-date exchange rates. Not a market total.
How the total is built →
Financings dated 2026 so far
185
The most of any year in the register, ahead of 158 in 2025.
Every record by year →
Falling due in 2029
US$80.8bn
Original amounts of 46 maturities, the peak year. Not current balances.
Debt maturity calendar →

As of the register update of 19 November 2026. Counts are research coverage from public sources.

From the register

From the grid to the GPU

Four steps into one campus, and the financing at each one.

From the substation that powers the site to the GPU board that secures the loan.

An electricity substation under a blue sky, in duotone.A data centre campus beside open land and a railway line, illustrated, in duotone.A data hall cut away with its roof lifted, showing racks and cooling pipework, illustrated, in duotone.A GPU board beside its heat sink, illustrated, in duotone.
1 of 4 · The grid

Step 1 · The grid

Power comes before the building.

Powered land is valued on its grid connection: the interconnection agreement, the substation and the date it energises.

Photo: janilson furtado on Unsplash, duotone by InfraCompute.

*Drawn from public sources only. Not our view of what is market.

Where to start

Start with your question

Pick a question to see where the answer is.

554

financings in the register to compare against

Which deals compare to mine?

Search the register. Every deal page lists comparable financings from other borrowers and says what matches and what differs.

Search the register Compare side by side

33

filed clause extracts, by clause type

What did the filed deals agree on a term?

The filed wording on cash traps, covenants, backstops and step-in, and where each side usually lands.

Terms and precedents Clause libraryLegal desk

450

filed credit agreements, leases and backstops

How is it structured and secured?

Security over GPUs country by country, and the filed credit agreements, leases and backstops behind each structure.

GPU security by country Precedent packs

12m · 24m · 5y

maturity windows, by instrument and region

What falls due, and when?

Original financing amounts by year due, from bonds, ABS and loans, with indicative dates kept apart.

Maturity calendar Refinancing monitorLatest financings

13

questions lenders ask of a contract

Will lenders accept this contract?

Run a customer contract or lease through the questions lenders ask, and see what the counterparty has signed before.

Check a contract Counterparty profiles

140

operator and issuer profiles

What has this company raised before?

Each operator's and issuer's financings on one page, and the lenders that keep coming back.

Operator profiles Lenders

Selected historical terms

What does GPU
debt cost?

Six disclosed floating margins over SOFR.
Explore the terms, then inspect the structure.

Historical selected terms, not a risk-adjusted ranking or an all-in cost index. Margins exclude the benchmark, fees, OID and hedging. Dates and structures differ. Mixed-rate parent packages and fixed coupons are excluded. Data cut: 22 October 2026.

Who it is for

Start with your side of the deal.

The same register, read four ways.

Randeep Bubbra

InfraCompute Weekly

The week in compute finance, read from the filings.

Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

Working on a GPU or data centre financing? Request a 20-minute call.

Fridays, one email. Work email only. Unsubscribe any time. Privacy.