Legal desk · Negotiation pack
Negotiating a data centre development loan
Every clause, on one page.
A development loan funds a data centre before it earns rent: either a short loan to buy land and start work before the tenant lease is signed, or a construction loan to a project company with a hyperscaler or GPU cloud tenant. The lender looks to the lease and the tenant for repayment. This page gathers what the filed documents say on each clause.
Updated 17 November 2026Built from the filed documents on SEC EDGAR
The short answer
20
Clauses, in the order they usually come up.
13
Filed documents quoted, each from the filed text.
3
Checklists for the deal type.
14
Points on the issues list, with the position of each side.
Key clauses
How the market has drafted each clause
20 clauses, in the order they usually come up. Each links to its page in the GPU loan summaries or the contract library. Subscribers see the filed wording and what each side asks, below.
Before the lease is signed
5 clausesThe filed pre-lease development loans: the lease deadline, repayment, the minimum return, rollover and defaults.
- The lease-signing deadlineMacquarie lent Applied Digital money to buy land and start building before any lease was signed. The loans run for about two years, but fall due within months if the lease is not signed by a set date.The contract library: the clause
- Repaid when the lease is signed or the equity arrivesA development loan is a bridge to the lease and the construction financing that follows it. The $100m note must be repaid in full within 90 days of the lease being signed.The contract library: the clause
- The minimum return: a multiple on invested capitalInterest is 8% a year, paid in kind for the first 12 months and added to the loan, then in cash. The real economics sit in the base return: Macquarie must get back 1.25 times what it lent on each draw of the $100m note.The contract library: the clause
- Rolling the loan to the next siteThe $100m note has a $45m first draw and a $55m second draw that Macquarie funds at its sole discretion. Applied Digital may ask to roll the loan into, or add loans for, other data centre projects, but the facility is uncommitted and each rollover needs Macquarie’s approval.The contract library: the clause
- Defaults tied to the project documentsThe $100m note makes it an event of default if anyone materially breaches, or if any party ends, a material project document.The contract library: the clause
Building it
5 clausesThe design-build contract the construction loan funds, and what the lender needs from it.
- Delay damages in a data centre buildNscale’s design-build contract for four buildings in Ward County, Texas sets a completion date per building, a 14-day grace period and then $714,285.71 a day, about $5 million a week, capped at $60 million.The contract library: the clause
- Substantial completion, retainage and lien waiversThe owner holds back 10% of each payment until substantial completion. Half is released at substantial and final completion; the other half 30 days after the defect correction period ends. The Ward County form of parent guarantee is marked not used, so the retainage is the main security.The contract library: the clause
- Lender rights in the construction contractThe Ward County owner may assign or pledge the contract to its tenant or any lender without the contractor’s consent, and may share confidential information with lenders, rating agencies and anyone else in the project financing. It may also end the contract for convenience at any time.The contract library: the clause
- Owner-furnished equipmentOwners now buy transformers, switchgear and generators directly to secure manufacturing slots, then hand them to the contractor to install.The contract library: the clause
- Tariffs, logistics and change ordersThe Ward County contractor takes the equipment logistics risk: transport, routes, roads and bridges, bonds and import and export permits. New trade embargoes and tariffs after signing are the exception. The contractor may claim a change order only on a short list of grounds.The contract library: the clause
Equipment bought ahead
4 clausesLending against turbines, transformers and other long-lead equipment before it is installed.
- Lending against long-lead equipmentFermi has two loans against equipment bought ahead of need. The turbine loan from MUFG advances 65% against delivered turbines and 55% against turbines still on order.The contract library: the clause
- Title, storage and supplier consentsUnder the Fermi loan, equipment counts as delivered only when the borrower group has full title on the purchase contract’s terms, it sits at an approved third-party storage site, and the warehouse operator has signed a consent.The contract library: the clause
- Selling equipment and value testsFermi’s lenders expect some turbines to be sold. A sale releases the equipment against a mandatory prepayment of the lower of the proceeds and the debt sized against it. The borrower reports an annual sales forecast and a quarterly sales report.The contract library: the clause
- Late or faulty equipmentFermi’s high voltage equipment loan treats equipment as impaired if final delivery has not happened by the acceptance deadline, or if installed equipment is faulty or fails its specification and tests.The contract library: the clause
The lease and the tenant behind the loan
6 clausesWhat the lender takes from the lease, and the support behind it.
- Lease delivery dates and late delivery creditsA data centre lease for AI capacity is a construction contract in all but name: the landlord commits to deliver halls and megawatts by a target date. Rent credits that grow with the delay are the usual remedy.The contract library: the clause
- Mortgages, SNDAs and collateral assignmentA tenant subordinates its lease to the landlord's mortgage only if the mortgagee agrees not to disturb it (an SNDA). The tenant's own lenders need the lease to be assignable as security. Both appear in the filings.The contract library: the clause
- Leasehold mortgages and lender cure rightsFermi’s 99-year ground lease from Texas Tech lets the tenant mortgage the lease and the improvements without the landlord’s consent.The contract library: the clause
- Tenant early termination and the termination feeA termination right in a long data centre lease is only financeable if the fee repays the landlord's debt. The filed Applied Digital leases for Buildings 2 and 4 and the Blackstone form all price it at the full remaining base rent.The contract library: the clause
- Hyperscaler recognition agreementsIn the Fluidstack leases at TeraWulf and Cipher sites, Google signed a recognition agreement with the landlord: a right to cure the tenant's defaults, and on a Fluidstack default a choice between taking over the lease or paying a termination fee.The contract library: the clause
- The default trigger and the deadlinesGoogle’s backstops of the Fluidstack leases turn on one trigger: Fluidstack’s insolvency, or a payment event of default under the lease. The landlord must tell Google at once.The contract library: the clause
The filed wording
What the documents say, and what each side asks
The quotation for each clause, and what each side usually asks.
Where the market is split
Where the filed documents differ
On these points two filed documents were drafted differently. Each cell is a summary of the filed wording, linked to its page. We do not give a view on which is better.
One way Macquarie $100m development note: The $100m note matures on 18 December 2027, but falls due on 18 July 2026 if the lease is not signed by 18 April 2026.
Another way Macquarie $50m development note: The $50m note fell due on 1 February 2026 unless a 200 MW lease was signed by 31 October 2025; otherwise it ran to 9 September 2027.
One way Macquarie $100m development note: Interest is 8% a year.
Another way Macquarie $50m development note: The earlier $50m note set the base return at 1.10 times.
One way Applied Digital / CoreWeave lease: Termination for convenience on notice, against a fee of 100% of the scheduled Base Rent for the rest of the term, paid before the termination date.
Another way BXDC form lease: Termination of any phase on notice, for a fee in a schedule, paid as liquidated damages.
One way Fermi turbine warehouse loan: The advance rate is 65% for delivered equipment and 55% for equipment still on order.
Another way Fermi high voltage equipment loan: For high voltage equipment the advance rate is 80% of the purchase price, with the borrower funding the other 20% in cash.
UK and US points
Where English and US law change the documents
- 14 rules of English law that change the documents in a GPU or data centre financing, each quoted from legislation.
- 13 points on enforcement, insolvency and sale, with the US and English rules side by side.
- UK and Irish planning decisions on data centres, and what each means for a lender.
- Grid connection and power rules, compared by country.
Before the first call
The issues list and the checklists
- Pre-lease development loanIssues list5 points, with each side’s position and where the filed deals land.
- Design-build contractIssues list5 points, with each side’s position and where the filed deals land.
- Equipment warehouse loanIssues list4 points, with each side’s position and where the filed deals land.
- 33 items. In-house teams at data centre developers and their lenders, preparing for financial close and the first construction draw.
- 27 items. Legal teams at data centre developers and landlords reviewing a hyperscaler or AI lab's lease or colocation form.
- 23 items. In-house teams at data centre developers, and lenders' counsel, diligencing how a data centre gets and pays for its power.
- Data centre construction loanAnnotated term sheet12 lines, each with the filed range and where each side pushes.
Filed precedents
The documents behind the pack
Contracts and loans quoted above
13 documents- Fermi Texas Tech ground leaseDated 14 May 2025 · Fermi S-11, Exhibit 10.9 · Quoted in: Leasehold mortgages and lender cure rights–
- Applied Digital / CoreWeave leaseDated 28 May 2025 · Applied Digital 8-K, Exhibit 10.1 · Quoted in: Lease delivery dates and late delivery credits · Mortgages, SNDAs and collateral assignment · Tenant early termination and the termination fee–
- Google recognition (TeraWulf)Dated 13 August 2025 · TeraWulf 8-K, Exhibit 10.1 · Quoted in: Hyperscaler recognition agreements · The default trigger and the deadlines–
- Applied Digital / CoreWeave Building 4 leaseDated 28 August 2025 · Applied Digital 8-K, Exhibit 10.1 · Quoted in: Lease delivery dates and late delivery credits · Tenant early termination and the termination fee–
- Macquarie $50m development noteDated 9 September 2025 · Applied Digital 8-K, Exhibit 10.1 · Quoted in: The lease-signing deadline · The minimum return: a multiple on invested capital–
- Ionic Digital lease to NscaleDated 14 October 2025 · Ionic Digital S-1, Exhibit 10.16 · Quoted in: Leasehold mortgages and lender cure rights–
- Google recognition (Cipher)Dated 20 November 2025 · Cipher Mining 8-K, Exhibit 10.1 · Quoted in: Hyperscaler recognition agreements · The default trigger and the deadlines–
- Macquarie $100m development noteDated 18 December 2025 · Applied Digital 8-K, Exhibit 10.1 · Quoted in: Defaults tied to the project documents · Repaid when the lease is signed or the equity arrives · Rolling the loan to the next site–
- Nscale Ward County design-buildDated 28 January 2026 · KiNRG S-1/A, Exhibit 10.13 · Quoted in: Delay damages in a data centre build · Lender rights in the construction contract · Owner-furnished equipment–
- Fermi turbine warehouse loanDated 10 February 2026 · Fermi 8-K, Exhibit 10.1 · Quoted in: Lending against long-lead equipment · Selling equipment and value tests · Title, storage and supplier consents–
- Fermi high voltage equipment loanDated 19 February 2026 · Fermi 8-K, Exhibit 10.1 · Quoted in: Late or faulty equipment · Lending against long-lead equipment · Title, storage and supplier consents–
- Applied Digital lease assignmentDated 30 March 2026 · Applied Digital 8-K/A, Exhibit 10.3 · Quoted in: Mortgages, SNDAs and collateral assignment–
- BXDC form leaseDated 29 April 2026 · Blackstone Digital Infrastructure Trust S-11/A, Exhibit 10.4 · Quoted in: Lease delivery dates and late delivery credits · Mortgages, SNDAs and collateral assignment · Tenant early termination and the termination fee–
Deals in the register behind the term sheet
8 dealsNscale: Kvandal South data centre facilities · DDSP: DDSP Sedenak Johor green loan · Digital Edge: Digital Edge and B.Grimm Power BKK campus green loan · Applied Digital: APLD ComputeCo 3 bridge construction facility · EdgeCore Digital Infrastructure: EdgeCore AS01 and AS02 Sterling construction loans · TeraWulf: Raylan Data Hawesville delayed draw bridge · Galaxy Digital: project construction senior secured term loan · Applied Digital: Data-centre construction loan
Precedent pack: Customer contracts, leases and backstops lists 17 filed documents on SEC EDGAR, and the contract library quotes them clause by clause.
Method
Method. Every source is a filing on SEC EDGAR, legislation or a regulator’s page. Each clause summary and quotation is read from the GPU loan summaries and the contract library, where it is quoted from the filed text. Nothing on this page is new analysis. General information drawn from public filings. It is not legal advice on any transaction, and using this page does not create a lawyer-client relationship.
*Drawn from public sources only. Not our view of what is market.