Every deal, one list.

The register holds 113 data centre asset-backed securitisation issuances from Feb 2018 to Sep 2026, from 19 issuer groups, and 13 single-asset CMBS. Each row gives the issuer, date, stated size, rating and tranche notes as the record reports them, with the primary source. Where the record does not state a field, the row says so.

Updated 17 November 2026Read from the register and from filed documents

NOT LEGAL ADVICE This page is general information only. Laws and regulations change and every matter differs, so take independent legal advice before acting. Read the full notice below.

The short answer

113

ABS issuances in the register, Feb 2018 to Sep 2026.

36

issuances dated 2025, against 24 so far in 2026 (to Sep 2026).

US$12.1bn

in US dollar sizes stated for 2025 (24 of 36 issuances state a size).

13

single-asset CMBS issuances, listed separately below.

How many issuances, and how much each year

Totals by year

How many issuances, and how much each year

Counts are all issuances dated in the year. Sizes are the amounts the record states, in US dollars; other currencies are shown apart and not converted.

ABS issuances by year, newest at the right

20182019US$1.1bn2020US$575m2021US$2.5bn2022US$821m2023US$4.4bn2024US$5.9bn2025US$12.1bn2026US$8.8bn
YearIssuancesSize statedUS dollar sizes statedOther currencies
  • 2026248 of 24US$8.8bn£532m
  • 20253624 of 36US$12.1bnC$320m, €720m, £254m
  • 2024179 of 17US$5.9bn£700m
  • 2023139 of 13US$4.4bnnone
  • 202253 of 5US$821mnone
  • 202194 of 9US$2.5bnnone
  • 202042 of 4US$575mnone
  • 201932 of 3US$1.1bnnone
  • 201820 of 2none statednone
All 113 data centre ABS issuances

The deals

All 113 data centre ABS issuances

Newest first. The issuer name links to the deal record; the source column links to the primary source the record cites. No part of this list can be downloaded.

Issuer and seriesDateSizeRatingTranche notesSource

Ratings and coupons are as the record reports them and name the agency where the record does. A coupon shown as N-PORT comes from the holdings that registered funds report on SEC Form N-PORT. A spread described as read from a dealer chart is approximate.

The 13 data centre CMBS issuances beside them

Single-asset CMBS

The 13 data centre CMBS issuances beside them

A single-asset, single-borrower CMBS lends against a mortgage on one property or portfolio, so it is a different structure from a master trust. We list it apart so the ABS totals above stay comparable.

Issuer and seriesDateSizeRatingTranche notesSource

The difference between the two is set out in data centre ABS compared with project finance and CMBS.

What the list includes and leaves out

What is counted

What the list includes and leaves out

  • Included

    Records in the register that are data centre securitisations of leases and cash flows from operating data centres, in any currency: 113 ABS rows, and 13 CMBS rows apart.

  • Left out

    7 records in the same layer that mix data centres with towers or other digital infrastructure, and GPU-backed securitisations, which sit under GPU ABS.

  • Dates

    The date is the date the record gives for the issuance, which can be the pricing, closing or filing date. Where only a month is known the row shows the month.

  • Sizes

    Sizes are the stated amount of the notes in the record, in the currency stated. A rated series and its unrated companion classes can be counted together or apart, as the record states.

  • Sources

    The source is the record’s primary source: an SEC filing, a rating agency report or a company release. Where only a press report exists the row says Press.

The register is read from filings and releases and is updated as new issuances are filed. We last updated this page on 17 November 2026.

Questions about data centre ABS issuance

Questions

Questions about data centre ABS issuance

How many data centre ABS deals are there?

The register holds 113 data centre ABS issuances (and 13 single-asset CMBS) as at 17 November 2026. The first is Vantage Data Centers Issuer 2018-1 in Feb 2018. Series issued together are listed as separate rows where the record separates them.

How much data centre ABS was issued in 2025?

In 2025 the register has 36 issuances, of which 24 state a US dollar or other size. The US dollar sizes stated add to US$12.1bn, plus C$320m, €720m, £254m in other currencies. The true figure is higher, because many rows state no size.

Who issues data centre ABS?

The register has 19 issuer groups, among them STACK, Vantage, Compass, CyrusOne, Aligned, DataBank, Switch, Sabey, QTS, Centersquare, Flexential and TierPoint. Each issues through its own master trust, adding series over time.

What ratings do data centre ABS notes carry?

Where the record states a rating it is mostly in the A and BBB categories for the senior and second classes, with some senior classes rated higher. The rating column names the agency where the record does.

Is there a data centre ABS deal in the UK or Europe?

Yes. The register has sterling and euro issuances, among them a £700m series in May 2024 and a €720m series in May 2025 from the Vantage group, and a £532m green ABS for a Slough campus in February 2026.

Can I download the deal list?

No. The list is on the page for reading. We do not publish the register as a download, an export or a bulk interface.

How is data centre ABS different from CMBS (data center CMBS)?

ABS in a master trust lends against the lease cash flow of a pool of buildings and adds series over time. A single-asset CMBS lends against a mortgage on one property or portfolio. See how data centre ABS works.

Primary sources
Gated extras and tools

Extras

Gated extras and tools

Method

Method. Every figure is read from the InfraCompute register, from a filing on SEC EDGAR, from legislation or from a rating agency or company release, linked in the text. Nothing on this page is new analysis, and the page gives no view on which structure to use.

*Drawn from public sources only. Not our view of what is market.

ABS and CMBSMoving a portfolio into ABS or CMBS? We are happy to talk through how data centre securitisations treat lease terms, tenant concentration and the cash trap. Talk it through

Randeep Bubbra

InfraCompute Weekly

The week in compute finance, read from the filings.

Deals, terms and the clauses behind them, for the people financing data centres, GPU clouds and the power behind them. By Randeep Bubbra.

Want to run your own deal through these tools? Request a 20-minute call.

Fridays, one email. Work email only. Unsubscribe any time. Privacy.